Construction: $13002.00 on the cheap side.
Moving and putting it onto the basement: $3000.00 on the cheap side.
Licenced drafter to draw up the plans: $2000.00
Drain tile, insulation, sump pump. Ect. $1700.00
permits: $1600.00 on the expensive side.
Any extras like a deck thats up to you. Don't know.
Moving and putting it onto the basement: $3000.00 on the cheap side.
Licenced drafter to draw up the plans: $2000.00
Drain tile, insulation, sump pump. Ect. $1700.00
permits: $1600.00 on the expensive side.
Any extras like a deck thats up to you. Don't know.